The ZeePMT Team
Articles by The ZeePMT Team on running Technical Assistance Facilities.
About the author
The ZeePMT Team
The ZeePMT product and operations team writes about building and running Technical Assistance Facilities. Their field notes cover the full request-to-closure cycle — from request intake and action planning to working-day and mission-day tracking, document lifecycle, multi-country portfolio views and the governance choices that underpin European-hosted, GDPR-aligned deployments. The team draws directly on experience with live TA Facility operations, translating operational patterns into practical guidance for implementing agencies, consulting firms and international NGOs.
14 articles in this archive. Browse all field notes or request a demo.

If We Missed You at AidEx Geneva
AidEx Geneva 2026 is behind us. If you did not make it to stand B6/a, the conversations we were there to have are still open. Here is how to continue them.
Read article
We Open at Palexpo Tomorrow
AidEx Geneva opens Wednesday 21 October. Find ZeePMT at stand B6/a in Hall 4. Practical visitor information and what we are there to talk about.
Read article
Seven Days to AidEx: What We Will Talk About at Stand B6/a
One week until AidEx Geneva opens. Here is what we plan to talk about at stand B6/a and why the theme 'Beyond Delivering More with Less' is the right frame for a conversation about facility operations.
Read article
A Guided Tour of the ZeePMT Interface
ZeePMT is built around the assistance cycle, not around a list of features. This tour follows the operational chain from the first request to the final audit trail — showing what each screen decides, not just what it displays.
Read article
Interconnected, Not Merely Co-Located: Why the Operational Structure Matters
Keeping requests, experts, documents and budgets in one system is a start. What makes the difference is whether they are connected — so a change at activity level is visible at programme level without manual reconciliation.
Read article
What ZeePMT Does Not Do — and Why That Is a Feature, Not a Gap
ZeePMT does not do household survey capture, enumerator management or offline field data collection. That is a deliberate positioning decision — and understanding it is the fastest way to know whether the platform is right for your operation.
Read article
Document Lifecycle: Beyond the Shared Drive
In a TA facility, documents without operational context are a liability at audit time. Here is what tagging documents to their unit, role and status actually means — and what it makes possible.
Read article
Running a Multi-Country TA Portfolio Without Losing the Thread
When a facility spans multiple countries, partners and funding sources, data fragments into shadow trackers. Here is why a portfolio view is not a dashboard add-on but a structural requirement.
Read article
Working Days and Mission Days: The Currency of TA Delivery
In technical assistance, working days and mission days are how delivery is measured and how costs are accounted. Here is why the gap between planned, contracted and actual matters — and what it costs to track it badly.
Read articleAbout these field notes
Practical guidance for TA Facility teams
Page 1 of 2 covers 9 articles published between 28 July 2026 and 27 October 2026.
These Articles by The ZeePMT Team cover the operational decisions that Technical Assistance Facilities face day to day — structuring requests, mobilising expertise competitively, tracking working and mission days, monitoring results against the logframe, and producing audit-ready donor reports. Each article is grounded in how TA Facilities actually operate rather than adapted from generic project-management advice.
ZeePMT is built around the same operational patterns: a single connected system that takes a facility from request intake through expert assignment, action planning, delivery tracking and donor reporting — hosted in Europe, GDPR-aligned by default, and purpose-built for the organisations that run EU-funded technical assistance. Browse all field notes or request a walkthrough.
Who writes these
Articles come from the ZeePMT product and operations team and from practitioners with direct experience running Technical Assistance Facilities — no generic business content, no adapted project-management advice.
What you will find
Request management, expert mobilisation, calls for expertise, working-day and mission-day tracking, results-based monitoring, donor reporting, GDPR compliance and EU programme governance.